Why permit timing shapes the whole schedule
Permit review is the longest wait before construction starts, and a full secondary-suite application takes longer again because of mechanical and fire-separation review. Those timelines are outside anyone’s control once the application is in, which is why we tell you the realistic range at the start of the project rather than after you’ve already scheduled a contractor around an optimistic guess.